SULZER 300,000 GALLON TEST PIT Demolition of two existing underground water tanks and re-construct one 300,000 gallon underground tank.
SULZER 300,000 GALLON TEST PIT Demolition of two existing underground water tanks and re-construct one 300,000 gallon underground tank.
ORCHARD VIEW FARMS This project consists of a 20,000 square foot building expansion with a 11,000 square foot structural mezzanine.
The 10,000 square foot facility provides the room needed to work on the current fleet of advanced equipment from snowcats and loaders to buses and trucks.
40 Ton Crane Upgrade. Saw Cut and pour new footings with micro piles. Replace old timber beams with new structural steel columns and crane beams.
The building is a reverse tapered column 186′ clear span rigid frame including one bay with clear spans of 196′.
Tenant Improvement – Frame Interior office, X-ray rooms, examination rooms, offices and restrooms.
This building is a two story structure. The framing system utilized was single slope clear span rigid frame.