WASTE MANAGEMENT TUALATIN
The building is a reverse tapered column 186′ clear span rigid frame including one bay with clear spans of 196′.
The building is a reverse tapered column 186′ clear span rigid frame including one bay with clear spans of 196′.
Tenant Improvement – Frame Interior office, X-ray rooms, examination rooms, offices and restrooms.
This building is a two story structure. The framing system utilized was single slope clear span rigid frame.
The special features on this building included insulated panels, parepats, internal gutters and Standing Seam 360 roof.
Design/Build Project-17,000 s/f Metal Building Project for Astoria Ford that will break ground this summer.
110,000 Square Foot Transfer Facility for The City of Seattle. Features: CPI glass Roof and Wall systems.
Furnish and install of four metal building structures located at oak lodge sanitary district.
22,000 square foot metal building with a two story CMU office.
5,687 square foot metal building with a 1,017 square foot mezzanine to house a maintenance shop, dispatch office and associated storage. A new parking lot with 36 paved outdoor bus storage stalls and 36 paved employee and visitor vehicle parking stalls will be installed along with a new driveway to Southeast Sunset View Road.