FAIRWINDS DESERT POINT
FAIRWINDS DESERT POINT Project details coming soon.
FAIRWINDS DESERT POINT Project details coming soon.
OREGON CITY CHRISTIAN CHURCH This project consists of a 15,000-square-foot building, including a full-size gym, multiple classrooms, and a kitchen. OCCC is now able to provide after-school programs, home-school pods, Bible studies, community events, and sports programs for the community.
UNITED PRECISION CORPORATION The recently completed United Precision Corporation headquarters project features a 30,000-square-foot, one-story, pre-engineered metal building machine shop with a 20,000-square-foot, two-story office building.
CAMAS HIGH SCHOOL FIELD HOUSE PHI Construction, Inc teamed up with Tapani, Inc and provided design and supply of a 12,500 square foot pre-engineered metal building for Camas High School.
WASHMAN CAR WASH AND AUTO SPAS An 8,000 S.F. drive-through carwash facility with 29 vacuum stations.
OREGON STATE UNIVERSITY CAMPUS OPERATIONS CENTER The OSU Campus Operations Center project included the new construction of a three-story, Pre- Engineered Metal Building, and buildouts for new operational shop spaces to support facilities services (carpentry, painting, vehicle maintenance, plumbing, landscape, electrical, and other trades). Additional outbuildings, such as the lube shop and covered parking structures,…
PROLOGIS MEADOWS PHI Construction, Inc teamed up with Perlo Construction on another successful project. PHI provided and erected Two 45,000 S.F. Load out canopies on each side of the concrete tilt building. The canopies have Kingspan wall panels and an internal gutters system. Erection was completed in 14 Weeks.
CURTIS TRAILERS The Curtis Trailers West new building is a 25,000 S.F. Pre Engineered Metal Building with a 3,000 S.F. Mezzanine office. The building will include new offices, conference rooms, bathrooms, lobby, waiting area. Curtis Trailers will now be able to accommodate more recreational vehicles 20,000 S.F. of service area.
AVIATRIX VENTURES The new Aviatrix headquarters in Sherwood, Oregon includes a two-story office comprised of a pre-engineered mezzanine system with a concrete floor. The 8,000 square foot office includes three conference rooms, private offices, kitchen, and break rooms. The warehouse is designed for racking, stacked up to 20′ for merchandise storgage, along with a function…
DICK HANNAH COLLISION CENTER Dick Hannah Collision Center, in Vancouver, is a new, 75,000 SF pre-engineered metal building for a state-of-the-art facility featuring two large lounges and an enclosed vehicle write-up area. Modern technology throughout the building includes over 75 workstations, four double-sized spray booths, a High Roof paint booth, 45 adjustable-height lifts with compressed…